Roseburn Park – A Vision for the Future

From consultation to action

In 2023, Friends of Roseburn Park asked local residents and park users what improvements they would like to see in the park. The consultation helped us understand what matters most to the people who use Roseburn Park and has helped shape our plans for its future.

Current proposal: These proposals are being developed by Friends of Roseburn Park following the 2023 community consultation. Designs, locations and costs may develop as the project progresses.
238 Survey responses
82% Supported or were comfortable with an outdoor gym
78% Supported or were comfortable with a teen area

What people wanted

The consultation asked park users about a wide range of possible improvements. There was particularly strong support for better facilities, seating, paths and opportunities for recreation.

Covered seating near the café 95%
Measures to reduce cycle/pedestrian conflict 93%
Bike stands for cyclists visiting the café 93%
Refurbished drinking fountain 92%
More carved log benches 90%
Trim trail around the park 88%
Outdoor gym stations 82%
Walking track along the southern boundary 80%
Teen area at the ice-rink end 78%
View the full 2023 consultation results

The wider vision for Roseburn Park

The 2023 consultation considered a range of possible improvements across Roseburn Park, including new facilities, paths, seating, recreation areas and improvements around the café.

Roseburn Park improvement plan showing proposed locations for new facilities

Outdoor Gym

We want to create an accessible outdoor fitness area that can be enjoyed by people of different ages and abilities.

The proposed gym would include a range of equipment designed to provide different forms of exercise, including cardiovascular, strength and mobility activities.

Outdoor leg press equipment

Leg Press

Outdoor recumbent exercise bike

Recumbent Bike

Outdoor plyometric exercise boxes

Plyometric Boxes

Other proposed equipment includes a chest press/seated rower and assisted pull-up equipment. The gym would also include approximately 50 m² of safety surfacing.

A space for young people

Proposed basketball hoop and goal end for the teen area

The proposed teen area would provide a dedicated place for young people to meet, socialise and be active.

The current proposal includes:

  • Basketball hoop and goal end
  • Sheltered seating
  • Space for young people to meet
  • Safety surfacing

Friends of Roseburn Park proposes locating the teen area near Murrayfield Ice Rink, separated from the main children’s play area and away from nearby homes.

Where would the new facilities go?

Friends of Roseburn Park’s preferred layout retains the toddler play area, places the outdoor gym beside the embankment and positions the teen area towards the Murrayfield Ice Rink end of the park.

Map showing preferred locations for the outdoor gym and teen area

What residents said

The consultation generated a wide range of comments. Many people welcomed the proposed improvements, while others raised concerns about maintaining open space, managing anti-social behaviour and choosing the right locations.

“Teen area and trim trail would be wonderful.”

“Pétanque and outdoor gym would be at the top of my list.”

“Really like the idea of the park having more things to do and being inviting to all ages.”

“It is very important not to fill the space too tightly – keep a feeling of openness.”

Improving paths around the park

The consultation also considered improving walking routes around the park. Different materials could be considered depending on appearance, accessibility, durability and cost.

Example of a natural surfaced walking path

A more natural walking route

A path around part of the park could provide a more reliable all-weather walking route while retaining a relatively natural appearance.

The 2023 consultation showed that 80% of respondents supported or were comfortable with a walking track along the southern boundary of the park.

Possible path surfaces

A number of different surfacing options have been considered. Each has different characteristics in terms of appearance, accessibility, drainage, maintenance and durability.

The examples below illustrate some of the types of surfaces that could be considered. No final surface has been selected.

Whin or granite dust path surfacing information

Whin or granite dust

A traditional-looking unbound surface that can give paths a relatively natural appearance.

Ultitrec path surfacing information

Ultitrec

A recycled aggregate surface that can provide a firm path while retaining a more informal appearance.

KBI Flexi-Pave path surfacing information

KBI Flexi-Pave

A bound and porous surface designed to provide a firm, accessible route while allowing water to drain through it.

Tar spray and chip path surfacing information

Tar spray and chip

A durable bound surface finished with aggregate chips to create a less urban appearance than conventional asphalt.

Current estimated project costs

The current estimated cost of delivering the outdoor gym and teen area is £52,593.

£27,395 Outdoor Gym
£25,198 Teen Area
Current total estimated project cost £52,593

Friends of Roseburn Park will seek funding and community support to help turn these proposals into reality. These figures are current estimates and may change as the project develops.

Help shape the future of Roseburn Park

Roseburn Park belongs to the community. Your support can help Friends of Roseburn Park improve the park for residents, visitors and future generations.